Guangyuan City, Sichuan Province Wangcang a coal mine after the purchase our factory bazhaji (bazhuangji | bashaji | pashaji) our factory in bazhaji Up (bazhuangji | bashaji | pashaji) transported to the construction of cross-section scene bitterness "story"
As you can see on Figure WG-80G iron wheeled bazhaji mine wellhead on the hillside above, there is no road bazhaji (bazhuangji | bashaji | pashaji) transported directly to the well head, and therefore only used in conjunction with the hoist and manual gourd roundbazhaji (bazhuangji | bashaji | pashaji) in the tramcar shelf above slowly pulled along the track to the wellhead.
The above figure shows the coal mine site wellhead, seen from the figure, the wellhead to the face as well as the period deviated from the need to be resolved, it seems to want to get work bazhaji (bazhuangji | bashaji | pashaji) cross-section is not so easy.thing ah!
The front overcome difficulties Finally, in our common efforts, the workers finally bazhaji (bazhuangji | bashaji | pashaji) smoothly open to the construction of cross-section. The figure bazhaji (bazhuangji Up | bashaji | pashaji) WG-80G Iron Wheel bashaji